Prepared tender packages, evaluations and cost estimates. Provided technical support for construction and commissioning.
Prepared electrical design and detailed electrical estimate
Feasibility Study. Prepared electrical|instrument budget estimate.
Prepared electrical instrument budget estimate
Prepared electrical instrument budget estimate
Investigated and reported on the optimal expansion and upgrade of the High Voltage Distribution System at Newman Hub
Bankable Feasibility Study for the Concentrator, Water supply and port facilities. Negotiated with Western Power for connections to three load sources from their high voltage system in the mid west of Western Australia
Electrical and instrument design