Evaluated options for power factor correction at various voltage levels, include pay back studies for each option
Prepared earthing design and HV submission for HV Upgrade Works associated with overland conveyor installation
Electrical design and commissioning
Electrical and instrument design
Prepared electrical design and detailed electrical estimate
The commissioning of an in-pit mining unit and slurry|tails pumping stations
Prepared electrical design
Prepared electrical design