Prepared electrical instrument budget estimate
Prepared electrical instrument budget estimate
Investigated and reported on the optimal expansion and upgrade of the High Voltage Distribution System at Newman Hub
Bankable Feasibility Study for the Concentrator, Water supply and port facilities. Negotiated with Western Power for connections to three load sources from their high voltage system in the mid west of Western Australia
Electrical and instrument design
Evaluated options for power factor correction at various voltage levels, include pay back studies for each option
Prepared earthing design and HV submission for HV Upgrade Works associated with overland conveyor installation
Electrical design and commissioning