Oversaw HV Switchyard design, installation and commissioning
Prepared detailed design packages and oversaw transformer manufacturing process for multiple customers
The installation of Power Factor Correction equipment at the 22kV and 415V levels to meet statutory requirements and increase transformer capacity.
Prepared budget estimates for ADSS and Fibre Optic Options
Prepared electrical design and procurement packages
Prepared electrical design
Prepared electrical design
Prepared electrical and instrument design, including P&IDs