The project involved the addition of fixed water cannons and the removal of sliding water cannons. Drawings for PLC control panel and field junction box rewiring were prepared.
Electrical design for various Light and Small Power and communications upgrades. The project involves the installation of additional lighting, power outlets, data outlets, air conditioning and office areas for the permanent workforce.
Detailed electrical, controls, communications and instrumentation design. The Project includes a number of storage tanks, a loading/unloading facility and various dispensing hose reel racks. The interface to an AdaptFMS system at each reel rack is included in the design.
Detailed electrical, controls, communications and instrumentation design for a centralised Potable Water System. The Project includes bore pumps, buffer tanks, transfer pumping stations and associated instrumentation, controls, communications and power supplies.
The commissioning of an in-pit mining unit and slurry|tails pumping stations
Feasibility Study. Prepared electrical|instrument budget estimate.
Prepared electrical instrument budget estimate
Prepared electrical instrument budget estimate